Business Continuity/Disaster Recovery Part I: The Aftermath of Natural Disaster. The only usable copy of the company’s disaster recovery plan was located in a locked cabinet in the heart of the disaster zone. Even when the waters recede and things start drying out there are going to be businesses that cannot resume normal operations due to structural or equipment damage. For those that need to relocate critical infrastructure, where do they move them to? What if many of these bridges are declared damaged and can’t be used until repaired?”]

